Déjà Vu
Open Date: 25 August 2001
Current Status:
The train is reversed out of the station and up a vertical lift hill until it reaches the highest point. The train is then released and rushes back down the track, through the station, and then on through a large cobra roll and a vertical loop. The train is then heads up a second vertical, is "caught" when it runs out of energy, and at the higest point is then released. The train then rushes back down through the layout travelling backwards, overshoots the station, and travels a short distance up the first vertical vertical lift and is 'caught' when it runs out of energy. The train is then lowered back down the lift and into the station.