All Activity

This stream auto-updates     

  1. Today
  2. jjuttp

    The Off Topic Topic

    It was what replaced the Draculas walkthrough.
  3. Mark Shaw

    Dreamworlds new pricing

    This is what's known as a "buying your way" into a market as distinct from "earning your way" into a market. I prefer the latter strategy. The latter strategy takes effort, balls, and drive. Discounting, how easy is that? It's like cost-cutting to drive short term profits. My 10-year-old could probably pull that strategy off.
  4. Mark Shaw

    Mark Shaw's 2017 CEO Sleepout fundraiser

    Thanks heaps Iwerks. Very generous donation tonight to get me kick started. I actually spent Easter Monday evening volunteering with the Vinnies "Vannies" volunteers, making sure the homeless of Collingwood won't go hungry tonight. It was humbling and I was completely taken aback at how chipper and upbeat these unfortunate people were and how thankful, appreciative and polite, despite living in conditions most of us would think inconceivable. Even the smallest donations add up. Thank you.
  5. It's that time of year again. https://www.ceosleepout.org.au/fundraisers/mark-shaw/?fbclid=IwAR2AoIuewvCEsZ5nTwYjPBT5OtXoejNqO2K4wy0BBuDrwlsN5pf_hJmwSEc
  6. If it's never gonna open, they might as well get rid of what's left. It's just a waste of space.
  7. pin142

    Wipeout Removal

    The park maps being handed out still have Wipeout on them and Sky Voyager listed as a new open attraction so the job ad is about as accurate.
  8. I have memories from age 4 and earlier. We've already made the decision not to take him to the states to do Fl and Ca until he's a bit older, but i'm comfortable he'll enjoy the experience, and remember the trip well enough.
  9. Aren't the Matterhorn Bobsleds technically classed as 'built in-house' ? I mean, I know Arrow are joint collaborators with WED, but it was also Arrow's first coaster, and Disney bought Arrow in 1960 - a year after Matterhorn opened... Sure, they'd contributed to several of the early Disneyland attractions, but it was still a relatively unknown manufacturer, who had never built a coaster before... So, while I agree with you that you don't find them often, I really need to disagree with you regarding Cannibal being the first - 56 years after Matterhorn opened.
  10. AlexB

    Wipeout Removal

    More likely, someone took the same copy-and-paste spiel they always use and didn't bother to proof read it to ensure it was up to date...
  11. Gold Coast Amusement Force

    Dreamworlds new pricing

    They aren’t. This deal has been done before and now that cosentino is gone, sv isn’t open and wipeouts gone it’s neccesary.
  12. Archer

    Dreamworlds new pricing

    So why does DW need to go even cheaper on their passes?
  13. Brad2912

    Dreamworlds new pricing

    They did it during kids months last year too
  14. pin142

    The Off Topic Topic

    Never heard of them which I guess could be another issue aside from the aforementioned cost.
  15. Adventures With JWorld

    The Off Topic Topic

    So credit to PCL for reporting this information first but it appears‘TrickPic’ closed its doors really without any notice. I did searching up as there’s no acknowledgement by the company stating it’s closed but turns out, If you search it up now on Google it states the attraction is now closed permanently I went there back in December with a few of my family members of last year and I thought it was okay but definitely not worth the price of admission and probably wouldn’t return Shame to see it not last long but hopefully something a lot more better than a photo studio takes it’s place
  16. themagician

    Dreamworlds new pricing

    The giant billboard outside the park says adults at kids prices. But it could be possible that offer is only valid during the Kids Month Cancel that
  17. pushbutton

    Dreamworlds new pricing

    My current pass is valid until 30th June, but I'm considering whether to buy a new one while this offer is on. I've never done this before, so does anyone know what happens in regards to the existing pass (can the new pass be valid from after the old one expires)? Also, I've just looked on the Dreamworld site and while kids passes are $109, adults are $129. Where did you see adults at kids prices?
  18. Gold Coast Amusement Force

    Dreamworlds new pricing

    So it seems that dw have gone from buy 3 get 1 free to adults at kids prices. 109 dollars is the price for 13 months entry and a photo pass.
  19. Yesterday
  20. Archer

    Movie World April Update

  21. Spotty

    Movie World April Update

    I really hope they were running 2 trains on all rides. It looked like in the video that Rivals was running 1 train, and same with Road Runner. Was also interesting to see the Wild West Roadhouse food outlet actually open as well.
  22. Brad2912

    Consentino Live at Dreamworld

    Cosentino has announced on FB that 22,798 was the total attendance over the 32 shows so a tad over 700 per show on average. Fantastic turnout and I think DW management do deserve some kudos for making it happen. I hope they continue to introduce external entertainment opportunities to the park that encourage people who generally may not have attended to come along and give the park another shot.
  23. Gold Coast Amusement Force

    Consentino Live at Dreamworld

    Here is the queue (this is the quality dw uploaded it in). C2058BD8-41C1-4B25-8913-73B2A082AA2E.MOV
  24. Archer

    Consentino Live at Dreamworld

  25. themagician

    Consentino Live at Dreamworld

    The final show had a queue that went down past the old Wipeout location
  26. Jobe

    Consentino Live at Dreamworld

    Bit like Park Chat Live? 😂😎
  27. Gold Coast Amusement Force

    Dreamworld April Update

    So the LEGO convention is taking place over this weekend and the next 2 weekends and is free. It’s being held in the parkway plaza. I uploaded a video of it if anyone is interested. It is a slideshow with pictures of all the builds but I figured it would be better than uploading 50 photos of legos and flooding this topic.
  1. Load more activity