The channel for the lift hill chain is mounted to the top of the track. The return channel will be bolted on the bottom of the truss, but these are not added until after the pieces of track are in place.

DC Rivals HyperCoaster construction

DC Rivals HyperCoaster construction

24 July, 2017 by Richard

The channel for the lift hill chain is mounted to the top of the track. The return channel will be bolted on the bottom of the truss, but these are not added until after the pieces of track are in place.

In this photo