In the event of a misfire of the launch system, the wheels are designed to act as the braking system. The wheels will lock to bring the train to a safe stop back in the station. A UPS system is utilised to ensure that a power outage midway through will not interrupt the launch procedure.

Mick Doohan's Motocoaster

Mick Doohan's Motocoaster

14 September, 2007 by Richard Wilson

In the event of a misfire of the launch system, the wheels are designed to act as the braking system. The wheels will lock to bring the train to a safe stop back in the station. A UPS system is utilised to ensure that a power outage midway through will not interrupt the launch procedure.

In this photo