As the twisted camel back goes into place, track is only bolted as much as needed to be self-supporting. The track will be fully bolted later in construction.
Movie World hypercoaster construction
Movie World hypercoaster construction
8 May, 2017 by Richard
As the twisted camel back goes into place, track is only bolted as much as needed to be self-supporting. The track will be fully bolted later in construction.