Notable parts still to be built include the "reverse twisted halfpipe" at the back of the swing launch, and the barrel roll at the end of the course.

Steel Taipan Construction

Steel Taipan Construction

31 May, 2021 by Parkz

Notable parts still to be built include the "reverse twisted halfpipe" at the back of the swing launch, and the barrel roll at the end of the course.

In this photo