The sides of the main trough are formed by lining these prefabricated steel segments vertically  against each other before filling with concrete.

Storm Coaster construction

Storm Coaster construction

11 June, 2013 by Richard Wilson

The sides of the main trough are formed by lining these prefabricated steel segments vertically  against each other before filling with concrete.

In this photo