The sides of the main trough are formed by lining these prefabricated steel segments vertically against each other before filling with concrete.
Storm Coaster construction
Storm Coaster construction
11 June, 2013 by Richard Wilson
The sides of the main trough are formed by lining these prefabricated steel segments vertically against each other before filling with concrete.