The unloading part of the station. Friction tires move the train on very quickly to the loading area, helping minimise lost time that can otherwise be a problem with this station design.

Expedition Everest

Expedition Everest

16 February, 2008 by Gavin Seipelt

The unloading part of the station. Friction tires move the train on very quickly to the loading area, helping minimise lost time that can otherwise be a problem with this station design.

In this photo