An overview of the site. Footings are present to literally a couple of meters away from the cream coloured fence at the far end of the site. The new coaster is not the only thing happening however, in the foreground the Vikings Revenge Flume has been fully resurfaced and repainted.

July 6th 2008

July 6th 2008

7 July, 2008 by Gavin Seipelt

An overview of the site. Footings are present to literally a couple of meters away from the cream coloured fence at the far end of the site. The new coaster is not the only thing happening however, in the foreground the Vikings Revenge Flume has been fully resurfaced and repainted.

In this photo