Before the ride's wet finale, the track makes a subterranean dive in this trench. Exposed steel reinforcing along the edges of the trench shows where a headchopper effect will be built over the track.
Storm Coaster construction
Storm Coaster construction
11 June, 2013 by Richard Wilson
Before the ride's wet finale, the track makes a subterranean dive in this trench. Exposed steel reinforcing along the edges of the trench shows where a headchopper effect will be built over the track.