The actual ride components have arrived on site. This is the main arm, with the 12 spinning gondolas attached to the angled joint at the left. The far right of the arm features counterweights to balance the rider load.

Tail Spin construction

Tail Spin construction

2 August, 2014 by Richard

The actual ride components have arrived on site. This is the main arm, with the 12 spinning gondolas attached to the angled joint at the left. The far right of the arm features counterweights to balance the rider load.