Jump to content

Gobbledok

Members
  • Posts

    202
  • Joined

  • Last visited

  • Days Won

    5

Everything posted by Gobbledok

  1. Something I hadnt thought of until now is that it might not be a case of parts taking 9 months but simply that the specialised people to commission it are booked up until then A fairly plausible scenario
  2. There is no chance of someone accidentally or mistakenly re-energising the track Zero
  3. Their director of comms confirmed it as fake Same as the Zamperla labels confirmed to be for wild mouse
  4. Cue standard response from @DaptoFunlandGuy of things can be changed again But hes right
  5. None of which would be in the space they could easily be elsewhere with some effort As for it not being tall enough back in the day scooby was the gremlins ride with a 8m tall roof Buildings can be changed and that space could be reworked if anyone cared enough The entire back area behind west is just a mess of mish mash of crap which should have had a giant maintenance facility built a long time ago I cant even see why ride rebuilds need to be done onsite anyway at all The same for most of that storage taking up a perfectly good show building If they stopped hanging onto decades old rubbish equipment and junk and stopped trying to re use stuff so they can save every buck possible on their entertainment offerings they wouldnt need all that space
  6. Stupidest thing they ever did moving maintenance in there They should have built a proper purpose built maintenance facility up the back of the park used the existing one for parade storage and kept the ride building as a ride
  7. Would that not make more sense where they actually have an arcade building
  8. And there it is exactly what is needed
  9. In other words people having a carry on facebook Nothing earth shattering there
  10. 9 months does seem like a long time But if they are getting a new car that would make sense cause supply chain on that sort of thing is still messed up the world over They had a lot of complaints over making conservative announcements for leviathan and then the dates blowing out so maybe they are being cautious this time
  11. Hey at least at Dreamworld fans are pointing out fonts they havent noticed and not entire coaster supports cracked in half
  12. Youre entitled to your opinion but at the same time you are still wrong If you were at the invite only opening you are probably biased towards the park Only running one site is cheap and crap and people in the day would sooner look at the ocean Im sure
  13. So they could only open one side for the launch night Doesnt bode well for the future Only one side operating shouldnt be the norm
  14. No cant really Just the same lets just bodgy our way through everything because i know everything attitude Numerous near miss cases When you have a park engineering manager stating on record that he cant be expected to know everything about every ride you have a very big problem Anyone that ever saw the inside of the rapids control panel knows what a shit show he was running
  15. That guy was dangerous Sheer arrogance at its finest Nearly killed people more than once at movie world and finally succeeded at dreamworld should be in jail
  16. lol Badge good luck having it on time or anywhere near budget you have them to thank for the atlantis shambles
  17. They got you on the pr payroll or what mate Also there is a difference between a first impression and a first photo and it has nothing to do with that universal rip off globe When you enter the park and see inside for the first time thats a first impression
  18. Surely dreamworld managers are not running the place based on parkz
  19. Right artwork wrong scale Why isn’t the wall that blue colour too
  20. Once people have finished their piss and moan and urge to click the default like react on a gold coast bully facebook post this will have zero negative impact whatsoever on the place It will just be yet another thing some theme park fans complain about along with the rest of the long list whilst they simultaneously show up and pay for their entry like always
×
×
  • Create New...

Important Information

By using this site, you agree to our Terms of Use. We have placed cookies on your device to help make this website better. You can adjust your cookie settings, otherwise we'll assume you're okay to continue.