-
Posts
15,133 -
Joined
-
Last visited
-
Days Won
675
Everything posted by DaptoFunlandGuy
-
TL:DR - I disagree with you. Because... reasons.
-
Did anyone get a complete record of the D60 ABC broadcast the other day, or did anyone find a good quality one online?
-
DC Rivals HyperCoaster construction discussion
DaptoFunlandGuy replied to Richard's topic in Theme Park Discussion
#StillBetterAudioThanAlvey -
DC Rivals HyperCoaster construction discussion
DaptoFunlandGuy replied to Richard's topic in Theme Park Discussion
OMG! Mack is going to refurbish a B&M Stand up hyper wooden dive coaster in time for the commonwealth games! -
If you're referring to the one being built right behind AOS, it's been referred to several times on the forums already. It's Sound Stage 9, which is being built to accommodate events during the commonwealth games. This also probably didn't need it's own thread and could have been asked in the random \ off topic topic.
-
If it were western themed, one could suggest the 'hammers' were 'diggers' ( @OceanGirl's kids would love it!) that were doing some dastardly work in the wild west... But as we've obliterated the western theme, and we're definitely sticking with DC Villains, I'd say the trench is for the footings (footers? the debate continues) for the ride. Looking at pictures of other twin hammers, the base of the ride would need to withstand some pretty gnarly forces - so a big hole will be filled by a big column. (Ok, I really couldn't think of a better term to keep the double entendre going.... @Slick any ideas?)
-
I'm liking what i'm seeing here, but i'll agree - this looks more permanent than temporary, and i'm with Slick on the same - the Island is actually a really good idea - it's close to the tiger facilities, it could be constructed without impeding any current guest experience, and it would be like entering another 'world'... rather than this random habitat in the middle of their thrill zone...
-
Yep - seeing the actual Oz Zoo enclosure I realise my memory was poor. I remembered the height of the glass, but didn't even realise the mesh \ whatever was there on those. The handlers do take the tigers on walks through the park, and for special groups - two guys, both with chain in hand. I realise with a full park it's much different, and you wouldn't want to startle them, but i do hope they find some way to still demonstrate \ show \ view the tigers whilst their home is being renovated.
-
For a 10-15 minute keeper talk, i think it'd be ok. They probably aren't using it for that, but given the tigers are such a big drawcard at the park, are they planning on not showing them at all during the 9 month downtime? Seems like a no-brainer to try and bring them out so people can still experience \ see them. Can't do a full show in an enclosure like that, but you could exhibit some behaviours relatively safely - so long as there was a safe path for the keepers to take them to back of house, I don't see why not.
-
I was going (badly) off memory of this image, but my memory of Australia Zoo's enclosure is that the walls don't appear to be much higher that what we're seeing at DW - although again its my bad memory. Sure the walls in the above pic look tall, but the bottom section is water - and they are roughly the same height at land level. TO me these walls (at land level) look about 10 feet, with an inward protrusion. now that i look closely at the DW pic - (the ladder gives a little more scale) it looks to be about 7 or 8 feet tall... so yeah probably "not quite" but one could probably do keeper talks in there for 10-15 minutes - just wouldn't allow them free roam during that time.
-
I would have thought, given a steam engineer needs suitable experience and qualifications, and a dreamworld ride operator main requirements are breathing and over 18 would mean the engineer would receive some form of 'skilled' pay increase. Sure, I guess when he's driving the diesel it doesn't matter - but on days he operates the steamer, he should be remunerated for the extra care, skill, and let's face it - risk - undertaken by the operator. So in conclusion - either the steam engineer was already on site operating DW X at the time, or the Baldwin didn't enter service until the following day. Either way that answers my questions.
-
So previously you said it had to be a well themed dark ride in order to claim 'worlds best'. Now that we seem to have gotten through to you that it's a coaster, you now say it has to be a well themed coaster with a dark ride element to be worlds best. Oi vey. I would be interested in a coaster very much thats just a coaster for the sake of vbeing a coaster. As long as some effort is put in to integrate the chosen theme with the surroundings. Green Lantern is a good example of this (which I might add is also a 'movie' theme). Push, you're in the minority. THe park is not setting out to please the minority. They never will. So you're always going to be disappointed. Unfortunately for you - nobody cares... because - well - you're in the minority (and you're annoying and repetitive). I could not have said that any better. Being rude to you is way more fun... besides - it's hard to ignore someone when they keep repeating that same thing over and over and over again.
-
Remember of course too that this development isn't just a ride, or a building. This is a habitat. They have to be careful that there are no materials used that the tigers are exposed to which could make them sick, so some things may have to be done differently to cater to that. These walls shown in Ninja's picture above - they almost look tall enough to accommodate the adult tigers... possibility?
-
My understanding was that the diesel had been operating that day and broke down at main street station during operations, not during morning checks. If i'm wrong then fair enough - my logic was that it'd take time to: try and fix DW X realise you won't get it done quickly call the engineer in perform boiler inspection and pre-start checks fire it up shunt DW X off the track and park it bring out the steamer. If i'm wrong, then its obviously no issue (and it isn't if i'm right anyway i'm just curious) but from what i'd heard, the diesel WAS operating during park hours, and then broke down... if thats the case, the 7 dot points above would likely have happened, which is a lot of effort for the park to go to at short notice
-
^and Green Lantern continues to stack in the brakes with guests on board... # @Noxegon
-
I know with a days warning they can - my question goes to the day the diesel broke down, and how they got the steamer fired up so quickly - Surely the engineer isn't on site every day...?
-
I'm not so sure thats the best idea - TBH if the old boot hill is going to be DC Villains, I can see a very well put together DC "good guy vs bad guy" stage show being put on in show stage. It would be easy (the universe exists and the backstories are solid) - a solid stunt type show - ala Action Man would fit perfectly. TBH - I hope they DO use Show Stage for this purpose.