Jump to content

Tricoart

Members
  • Posts

    705
  • Joined

  • Last visited

  • Days Won

    22

Everything posted by Tricoart

  1. Would ‘High Lawsuit Risk’ be in referral to actually suing due to the design of site itself, or an external issue that was influenced by the design of the site (like, being given false/hard to understand information from the site, that then led to a lawsuit)?
  2. My only guess is that they think it’s more than what it is, and want to treat it as such by waiting ‘til their ‘Opening _____’ advertising can hit the most people, regardless of how shit the park is rn & how that really hasn’t worked for them in the past.
  3. More behind-the-scenes footage/info to be released on Tuesday (From Movie World’s Insta)
  4. Definitely, it doesn’t have any track/supportd in the car park, nor any section blocked off for them, so i believe the images are from at least 2 weeks ago
  5. Tbf, that image is a preliminary image of the queue in its current, and unchanged, state. They haven’t started any work yet (apparently they don’t even have a solid plan so far, but that part is solely hearsay), so the extent of the work to be done is as of yet unknown.
  6. Yes, but that includes both directions/orientations, so having it only suitable for one seems rather backwards (mind the pun). If the addition/lack of a bumper is the limiting factor, I highly doubt it won’t have a bumper of some form on both the front and back of the train, as they’re seemingly commonplace even on trains that only run forwards. Also, the current obvious front ‘bumper’ that’s shown on the brown train mightn’t actually be the bumper, therefore not ending up present on the coaster itself.
  7. Just randomly checked Google Maps, & they’ve got updated aerial images yet again (albeit lower quality ones than NearMap). Wizard of Oz/Flash: Rivertown
  8. Again, both trains will travel in both forward & backward orientations throughout the layout, therefore it seems almost impossible that they’d somehow limit each train to only run in a single orientation/direction by design. In the case of one-train ops, they could keep either one of the 2 trains in the maintenance bay & keep the other cycling throughout the normal course, or any other iteration of the course that may (but likely wouldn’t) occur, I’d imagine without any real issue.
  9. It does specifically say ‘removal of the lockers system’ in the announcement post, and they have those paid lockers near GL that serve that purpose anyway. They may need that space for whatever solution they plan for Superman, too.
  10. A practical use case for this would be, if the weather isn’t permitting for the ride to run in the dominantly outdoor section, but it’s favourable enough to run the indoor section, cycling that once or twice instead. Though, given the (hopeful) on-ride storytelling focus, the fact that doing so would necessitate 1 train ops/significantly lower capacity, and the already niche use case even in a more practical scenario (I doubt people’d want to ride/staff it in such conditions anyway), I’d be surprised if such a mode was programmed. At the end of the day, if a second go-around on either half were to be needed for whatever reason (turntable stuck in position, second half valley, etc.), there’s always manual operation/evacs.
  11. Sorry, did you not see the part about it being #movieworldaus’s BIGGEST transformation to date? (They’re transitioning from the best theme park in the region to a barely passable amusement park).
  12. That’s why I believe it’s too little, too soon. I don’t think there’ll actually be any significant change ‘til it’s next maintenance period (at least, if they’re actually planning on changing the queue in a meaningful way & not rushing a BandAid fix), & that they’ve just decided to mention it in passing now to bloat their reasons for rides being down across the park.
  13. Switching the discussion from the specific statements about some of the new information that’s going on in their respective threads, is Super Heroes & Super Villains even that much of an event? Iirc, all it did was add/change a parade (which I don’t pay attention to, but I know already includes some Heroes & Villains in its’ base setup anyway due to having walked past it a lot), everything else about the park seemed to be the exact same.
  14. The turntable can’t rotate anywhere near enough to facilitate this. Disregarding that it’s an inclined turntable on a flat pivot point, meaning doing a complete 180° turn would have it sloped to exit the opposite direction of the continuing track, the catwalks & supports don’t allow it, & the train/turntable track itself would smack straight into the ride building. I feel like there are 2 scenarios: One that is better but negates the choice entirely, and one that is rather unlikely given the plans, but is the only real way that any choice of forwards/backwards would make sense. The first option is the main one, that the ‘choice’ is solely referring to which half of the ride will be travelled backwards, with one half needing to be no matter what. The second, less ideal/likely option is that you choose what half of the ride you’re wanting to go on, dependent on the way the trains are oriented at the time, and not doing both halves in one cycle as was presumed. That seems like an operational nightmare with the station setup that exists (as well as a bit of a letdown) though, so I’d like to assume the former will be true, and the ‘choice’ only exists to offer more rerideability/thrill by choosing to ride the faster section backwards, and not for anyone that is averse to going backwards at all.
  15. Will be interesting to see how they’ll deal with this whilst needing to keep separate load/unload stations, & not changing any of the ride experience. I feel like the most obvious solution is/was the aforementioned double-sided locker/storage bay either right before boarding or on the station platform, but either of those solutions have their own problems when not changing anything about the way the ride loads & unloads, as well as needing pretty significant queue route/building changes that only seemed within the realm of possibility if done alongside an eventual significant ride overhaul. Whatever it is, I hope that it’s not a short-term, BandAid solution to tide it over ‘til that time (hopefully) arrives, or they decide that it’s not worth doing.
  16. RPReplay_Final1714718949.mov Joke aside, at least they’re finally going to repaint the rest of DCR, and the Superman queue news is interesting, if perhaps sharing too little too soon to excuse some of the issues they’re having.
  17. In the Sunrise segment where they show the trains, the Dreamworld staff member that was interviewed states that riders’ll be able to choose between riding forwards & backwards.
  18. I guess the difference is the section that a given train will be backwards for (1 being backwards for the first half/indoors, the other being backwards second/outdoors)?
  19. Maybe it’s to help distinguish backwards/forwards cycles?
  20. Where have I seen that image before… Oh, yeah!
  21. Better than the orange in the older concepts, tbf
  22. More like, complicates the system with the existing lockers, adds an extra thing to train workers on, could make dispatches slower than their already glacial pace, and gives another reason to roster more than the bare minimum amount of staff.
  23. Breaking News: Village Roadshow theme park delays ride opening, replaces their already announced & advertised specific time period with vague subtitle.
  24. I’ve seen Superman do this, but only rarely & out of necessity, likely ‘cause it’s more for the ride ops to do.
  25. That was very obviously (at least to me, and confirmed by the artist) meant to be no more than a vague idea of the area’s vibe, though, like with the earlier New Atlantis concepts.
×
×
  • Create New...

Important Information

By using this site, you agree to our Terms of Use. We have placed cookies on your device to help make this website better. You can adjust your cookie settings, otherwise we'll assume you're okay to continue.