
Themepark Enthusist
Members-
Posts
89 -
Joined
-
Last visited
-
Days Won
1
Everything posted by Themepark Enthusist
-
Movie World Maintenance Schedule 2025
Themepark Enthusist replied to TV15's topic in Theme Park Discussion
When it’s open 10-3 every day I am sure we can agree that it is open due to a lack of competition and even then it does not have enough customers to pull to see full day trading hours. water parks take a lot of staff to run so operating a second park for 5 guests a day doesn’t sound super efficient. although this winter has been warm so maybe it would have been best to at least keep weekend trade til july -
Dreamworld - Proposed Development
Themepark Enthusist replied to Narra's topic in Theme Park Discussion
If Merlin wanted to buy it they’d 100% turn it into a Legoland… -
Dreamworld - Proposed Development
Themepark Enthusist replied to Narra's topic in Theme Park Discussion
The question is, if CE is really going to sell Dreamworld. Who is going to do it first because BHG isn’t going to hold onto village for much longer I see them reopening SDSC operating it for 1-2 years drive that value of the chain up then sell at the peak. will someone even buy DW? Or village for that matter? -
Dreamworld - Proposed Development
Themepark Enthusist replied to Narra's topic in Theme Park Discussion
If they are building resorts, who says they won't build a new park? it does seem like they are locking themselves in. But I still see a few areas that can be expanded into like behind WWW, the island in the middle, motocoaster and old LHLR site. Also we have seen parks get more creative withy how they use space (see phantasialand) they only have 50acres all up. So its not the end of the world as long as they can keep up with the new theming they have going and continue using the (frankly limited) land for new unique experiences. -
Adventure World new ride 2025
Themepark Enthusist replied to Tim Dasco's topic in Theme Park Discussion
I thought Aussie World have a similar ride that they have already built that just isn’t opened yet? -
Movie World Maintenance Schedule 2025
Themepark Enthusist replied to TV15's topic in Theme Park Discussion
Is that last straight part before the station flat, make it an unload station it will help speed up the load, then because we are now spending money money money… like new ride level of money then let’s add another block on the transfer turn to hold the trains for if they have been unloaded before they are ready for dispatch… no trains waiting except for empty ones -
Movie World Maintenance Schedule 2025
Themepark Enthusist replied to TV15's topic in Theme Park Discussion
It does not take weeks… like at Hyperia every time that valleys they need to take it apart and rebuild it and it does not take weeks to put the second train back. -
This Ride Ruined Movie World.
Themepark Enthusist replied to Dean Barnett's topic in Theme Park Discussion
https://abcnews.go.com/amp/US/tsa-fails-tests-latest-undercover-operation-us-airports/story?id=51022188 not Australia, but our security models are very similar. this isn’t the only time, a simple google would yield more results. -
Movie World Maintenance Schedule 2025
Themepark Enthusist replied to TV15's topic in Theme Park Discussion
You don’t need to run three at once in order to own three. Having three trains means that you will have access to two trains for normal day to day operation look at SFFT they purchased a third train for IR to ensure year round two train operation. -
I rode it today, it seems like the film is way brighter, I’m not sure if they reversed the screen but it’s crystal clear and way more immersive! I unfortunately didn’t get to experience the Australia film as I ran out of time but from Africa people were screaming of joy in the more exciting parts with is something I did not experience in the America film
-
Recently Movie World has been doing Throwback Thursday's and Flashback Friday's. It does seem strange that they have only been doing this for the past two weeks after nearly completing construction on the new float shed. I wonder if MW is conducting early market research through using these posts to find which ride has the largest fanbase for if they bring it back... unless I'm overthinking but it is fun to speculate.
- 5 replies
-
- movie world
- looney tunes river ride
-
(and 1 more)
Tagged with:
-
Movie World Maintenance Schedule 2025
Themepark Enthusist replied to TV15's topic in Theme Park Discussion
If there is anything in the main envelope that is required since there isn’t any drive tires or much else out there you’d only expect track inspection and possibly some sensors and theming. Most parks can get track inspections done before opening so realistically it’s not unprecedented to do those and any larger projects can be done during the day in the closed off station area. most parks being, Europa, universal (look at their BTS of the Mummy things like that). -
Movie World Maintenance Schedule 2025
Themepark Enthusist replied to TV15's topic in Theme Park Discussion
With KT having two tracks that can run independently from each other, you would hope they adopt the Dreamworld style approach that they do to the giant drop where they would perform annual maintenance to one side at a time leaving the other one operating -
I do not think thye should repopen Rivertown's station unless they can increase the capacity. On some weekends I have visited the park, the train can be quite a nightmare to get on, and on several occasions i have been shut out from getting on because it is too full.
- 34 replies
-
- dreamworld express
- dreamworld
-
(and 1 more)
Tagged with:
-
I would say, that it is crazy to not have the WoO open during the event, even if it was already costed and budgeted they probably had a comfortable profit margin already and should have the ability to spend a little more on having it open, unless of course their profits are so slim they can’t afford to spend that much more on staffing. But even then how can they then justify having it open during the day…
-
Does it?
- 1,413 replies
-
- vekoma
- dreamworld
-
(and 2 more)
Tagged with:
-
Didn’t Disney do this when they were testing Tiana’s Adventure? there is still time for them to add the additional new styled vehicles if that’s still the path they are wanting to go down.
- 1,413 replies
-
- vekoma
- dreamworld
-
(and 2 more)
Tagged with:
-
I have heard the same thing.
- 75 replies
-
- aqualoop
- wet n wild
-
(and 1 more)
Tagged with:
-
Dreamworld Maintenance Schedule 2024
Themepark Enthusist replied to themagician's topic in Theme Park Discussion
Personally I believe DW desperately needs a well themed water ride, something on Wild West Scale or Splash Mountain… they could even steal the theme from Mystic River Falls… they don’t need to build a whole mountain but it would require theming if it wants anything on WWF. Thrill rides are cool, but if you want a full day out you need those longer experiences that are longer then 2 minutes -
Dreamworld Maintenance Schedule 2024
Themepark Enthusist replied to themagician's topic in Theme Park Discussion
Both trains? Also you would be better off asking anyone but operations, from my experience in past jobs, the ground staff don’t usually get told what is happening it is more news that get tricked down the river, I therefore cannot trust the accuracy of that “source”. maybe there is another reason that hasn’t been considered, it’s an Intamin, and intamin takes a longer time to send parts out, maybe they found they needed a part but didn’t have it on hand? Like what happened with Superman Escape? -
Australia's biggest party
Themepark Enthusist replied to Ashley Jeffery's topic in Theme Park Discussion
I mean the Gel Blasters and LMCT+ Event don't seem family focused, maybe they are only wanting to push that for the general public as apposed to private events? -
They could be doing this now especially as they can just be cycling from transfer to the station, the ride does not need to do a full circuit to test any of the finer things. I would imagine there would be more then just one team working on the Jungle Rush area, and while some teams are working on MM, I'm sure Vekoma is down there programming and testing alot of the smaller aspects to a rides commissioning process. Not everyone works in a theme park, so no I'm going to assume most people have not read an operational manual related to a theme park ride
-
I don't think the testing is the end all and be all, doing some rough math and assuming the ride lasts 3 minutes, to get 500 cycles if that is what we are going to assume, that only requires 25 hours of cycles which can technically be achieved in two days if it comes down to that, or in 5days assuming they do 5hrs of cycling a day. We also haven't seen FoTWW start testing either so it is hard to know how far behind any of them are.