Jump to content

themagician

Members
  • Posts

    8,055
  • Joined

  • Last visited

  • Days Won

    518

Everything posted by themagician

  1. @STRAWS you’re probably right, otherwise it would be all of the news that people got trapped
  2. Wow, that’s interesting, never heard of that happening on this model of coaster.
  3. I would get there early and meet up with your group later if they aren’t bothered about some of the rides you’ll be able to get on. When I visited, Mine Cart Madness already had a 4 hour wait at the time the park was advertised to open.
  4. Based on the comments section of the post on socials, they don’t actually reveal anything new and the article is purely clickbait.
  5. The park typically opens an hour before it’s advertised opening, so be sure to get there at least 1.5 hours before the opening time. Thats definitely the best order to do those three rides in, and then if you have time do Minions. If you don’t, you’re not missing out on much, but it’s definitely worth walking through the land because it has been executed really well.
  6. The Gold Coast Bulletin has shared an article that refers to the reopening of Scooby-Doo and is apparently preparing to unveil a new ride: https://bit.ly/4nPiylM
  7. Honestly, even with express for the major attraction, you probably won’t even have time to go this ago. I haven’t experienced the one in Orlando, but if it was me I would skip it and use your time more wisely for other attractions that get the longer queues that aren’t on your pass. Also, if you have Jaws on your pass as an option, don’t waste it. The wait time for Jaws generally isn’t that long, or go as single riders (your chance of being able to ride with your friend/partner is high on this one).
  8. Doomsday Destroyer is the perfect example of a 360 swinging attraction that sucked (partly because it wasn’t unpowered)
  9. Out of no where, USJ has just opened a replacement for Backdraft. Unfortunately it’s just a replica of the Villain-Con Minion Blast that can be found at Universal Florida (which I haven’t read or seen good things about). It’s great they’ve added a good crowd soaker attraction, but my initial reaction is it’s a shame it’s this (especially when Backdraft was so good).
  10. I’m glad it doesn’t complete a full invert because I don’t think the park needs a ride that does that. It has Seprent Slayer and Tailspin as their inverting rides. King Claw will have enough speed and forces that inverting would probably be too much for most guests and would make the investment not worth while. I don’t know if this is currently the case, but I’m fairly sure Luna Parks model was having issues and couldn’t do the inversion for some time???
  11. @Cactus_Matt even with the angles not being the same, you can clearly see the ride is much taller. And no it won’t go 360 degrees.
  12. These photos from @Theme Park Girl show how it’s being installed and what it’s connecting too
  13. But also remember down the road we’re stilling waiting on Superman Escape to have its queue/locker upgrades, an all new dining experience to open, Doomsday to be replaced, Scooby to open, for WoO to become world class and for them to sort out their electrical system so they don’t have wiring hanging above guest areas. (The last couple I added for dramatic effect, but you get my point).
  14. Another great pic from @Theme Park Girl And for reference, here is a photo of The Claw from many years ago. You can see that the roof at the front right is still the same as gives an indication of how insanely big King Claw actually is!
  15. Considering The Claw started construction at the start of the year and was open in September, I’m honestly expecting a similar timeframe (if there aren’t any weather delays).
  16. The other half of the structure was installed this afternoon. Just the motor and pendulum arm to go!
  17. I spoke with the CEO, Greg a couple weeks ago about this. He indicated that the train will still be returning to a full loop circuit. There have been delays in rebuilding the track as fabricators/installer are harder to come by than you might think for train tracks. When this might happen, I don’t know, but Greg has expressed to be in the past how important the train is for the park and I get the impressed getting rid of it entirely isn’t an option.
  18. Dreamworld are hosting a fundraising event on Saturday September 6, 6pm to 10pm. The event is for over 18s and is $199 per person and includes the below. https://facebook.com/events/s/give-for-the-wild-a-gatsby-jun/5023010051257727/
  19. @rappa I’m not expert in this area, but looking at this close up photo from @Theme Park Girl to me they look like individual bulbs (but if I’m wrong, good to know they are actually LEDs).
  20. @New display name someone had shared some close up photos of the framing having rusting, so I’m thinking they removed it purely to do some repairs on the structure. But yes, why they didn’t go and get new bulbs to replace the few hundred that aren’t working baffles me. There’s a Bunnings within a 5 minute drive from the park, it can’t be that hard (I know the bulbs might not be standard, etc etc)!
  21. The slide towers platform has been reinstalled with the new openings for the slides to connect too. And there’s machinery on site constructing the new footings for the slides. Here’s a closer look at the slide pieces And the new supports for the attraction.
  22. Here is where they have repainted DC Rivals up too I believe they have painted the lift hill too And if you zoom in on this image you can see all of the dead bulbs Maybe they were never intending to replace the bulbs or finish repainting the track this year, but it is a shame too see when it’s closed for so long and they went to all that effort to remove the joker head.
×
×
  • Create New...

Important Information

By using this site, you agree to our Terms of Use. We have placed cookies on your device to help make this website better. You can adjust your cookie settings, otherwise we'll assume you're okay to continue.