Jump to content

mssveattck

Members
  • Posts

    74
  • Joined

  • Last visited

  • Days Won

    3

mssveattck last won the day on July 30 2021

mssveattck had the most liked content!

Park & Ride Stats

  • Park Count
    27
  • Ride Count
    201

Recent Profile Visitors

940 profile views

mssveattck's Achievements

Collaborator

Collaborator (7/14)

  • Dedicated Rare
  • First Post
  • Collaborator
  • Very Popular Rare
  • Reacting Well

Recent Badges

195

Reputation

  1. A new (much better) POV has been posted on the parks Instagram: https://www.instagram.com/tv/CTob2QJs5wf/?utm_medium=copy_link
  2. Source: https://www.instagram.com/p/CTYzkh3h5AH/?utm_medium=copy_link FullSizeRender.mov
  3. Train is currently loaded with water dummies and on the launch track, just after the switch.
  4. Queue covering is now fully installed, fencing around the ride is now beginning to go up. Source: https://www.instagram.com/p/CTRldCUBqeE/?utm_medium=copy_link
  5. The smaller rock archway after the MCBR is looking almost completed and crews are now working on the main rock tunnel. Station work continuing and electrical work on MCBR is happening too. More pathways have been poured, particularly towards the ride exit. Source: https://www.instagram.com/p/CR70l3xMea0/?utm_medium=copy_link
  6. Source: https://www.instagram.com/p/CRdNE5NH9g5/?utm_medium=copy_link
  7. Ah of course, that makes perfect sense RE gravel to protect the existing track. Thanks for clarifying!
  8. Not sure whether this has been discussed already, but a lot of the train track between Main Street station and the TOT station building has been ripped up (image source: https://www.youtube.com/watch?v=lpk0oAvh9JA&t=1034s). At first I thought it was surely just collateral damage from TOT demolition, but in the video it's suggested that the train will be rerouted directly along the former path of the TOT launch track with Main Street Station and the Level Crossing being moved essentially alongside MDMC. I know this is purely speculation and seems unlikely due to the pure amount of effort, but the removal of that additional track seems to support the theory. I think it would make sense considering Dreamworld's recent efforts to clean up parts of the park, plus it would fill that awkward space between ST and MDMC leaving plenty of room for new path space. Regardless, if true it'd be incredibly sad to see another part of Original Dreamworld History go if the original Main Street Station is no more.
  9. The tunnel has now been demolished pretty much up to the station building. Source: https://www.instagram.com/p/CQ4_HAgp7IB/?utm_medium=copy_link
  10. Section above the path between Main Street and Motocoaster entrance has been removed. Source: https://www.instagram.com/p/CQuaBpIBla-/?utm_medium=copy_link
  11. Source: https://www.instagram.com/p/CQqUs6JMrsg/?utm_medium=copy_link
×
×
  • Create New...

Important Information

By using this site, you agree to our Terms of Use. We have placed cookies on your device to help make this website better. You can adjust your cookie settings, otherwise we'll assume you're okay to continue.