Top Thrill Dragster at Cedar Point "Closing"


Coasterjoe
 Share

Recommended Posts

Just thinking about the closure, could it be that the wheels are compatible with the Zamperla track but not the Intamin track? I have been a bit sceptical of the ride when it was announced that it would use the Zamperla track but reuse the Intamin track.

Link to comment
Share on other sites

I feel confident that the zamperla track added to the ride was made to copy in every possible way the existing track of intamin such that there would be little noticeable differences between them. I don't think the track is in play here.

All i've seen so far suggests that components are wearing out quicker than anticipated. Everything is pointing to the wheels reacting differently to expectations (maybe weight balancing with the non-uniform guests loaded into it is causing uneven issues to develop not picked up in water dummy testing?)

Maybe the running surface of the wheel is wearing out too fast? Maybe the wheel itself is heating up and not dissipating the heat of the launch fast enough? Maybe a combination - heating up the compound causing the running surface to fail?

The statements made by the park suggest they're redesigning something on the train. My money is somewhere in this ballpark.

Link to comment
Share on other sites

ETR posted saying last night he is speculating TT2 could reopen as early as today - theorising that Zamperla \ CP are just going to increase the frequency of maintenance replacement for the part impacted.

So assuming its a wheel, just replacing it every 1000-2000 cycles instead of every 5000. I assume its short term while they redesign because long term that gets very expensive, but at least in the short term they get the ride re-opened, albeit at an increased expense.

 

Link to comment
Share on other sites

To me - this evidence strongly suggests that the bogies are causing the problem, leading to the train shaking and exceeding the LSM clearance tolerances.

They tested this by taping some LSMs to check for contact with the train, which indeed occurred. This is why they were running the train without passengers a few days ago.

IMG_7446.jpeg

IMG_7447.jpeg

IMG_7448.jpeg

Link to comment
Share on other sites

The two leading theories are wheel carrier adjustment to get the train running true which is much harder on a swing launch

And wheel breakdown which is knows as delaminating and likely would require changes to the compound used for the wheels

Both may require reengineering and or manufacture of new components plus shipping which would account for the extended downtime

You dont want chunks of wheel compound flying off the train a 200 kilometers an hour

Link to comment
Share on other sites

  • 2 weeks later...

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

Loading...
 Share

  • Recently Browsing   0 members

    • No registered users viewing this page.
×
×
  • Create New...

Important Information

By using this site, you agree to our Terms of Use. We have placed cookies on your device to help make this website better. You can adjust your cookie settings, otherwise we'll assume you're okay to continue.