Jump to content

All Activity

This stream auto-updates

  1. Today
  2. Paradise Country Farmstay is currently tendering out construction work. Will we finally see the first cabin built or is this something else?
  3. The castle is looking great once more. I can't wait to get a look inside.
  4. AQOd4SedXjFM_tdD6MYYd_D6RqsDEBBEMchaGC58tQNoaHvCMwhClWes9Rby7IARWBDUZAuOo6T8gp3iT-9Uqh1gIbxMMVi7jfu1zws.mp4
  5. Yeah Movieworld just posted it looks awesome
  6. @DaptoFunlandGuy There is a reason why you are the only person in history, to have their Parkz membership canceled and their money refunded.
  7. While I'm Not at the Park today, I've heard and saw on a Post that The Ride Sign is Back, and it Looks Miles Better than The ''Next Generation'' Sign.
  8. And it makes absolute sense - there is no MCBR. As soon as the train leaves the lift hill, there is absolutely zero you can do to prevent any mishap or accident until it hits the final brake run, which is automated and failsafe - The train will stop no matter what (and if it doesn't, nothing the operator does will change that). Some genius who has no idea about efficiency decided that the supervisor should stay at the panel 'just in case...' without ever finishing that sentence. They probably got paid thousands too. See - the seatbelt thing at Rivals - I don't agree with it but the liability issue makes sense - physically plug in the seatbelt, do it in front of your co-worker, and you've both witnessed a proper push-pull check of the main restraint lock, and then attached the seatbelt. You've got two people who will testify the harness was down, locked, and the supplementary restraint was engaged. It's why if one loader stops because there is an issue, the other one doesn't keep going. Taipan takes this further - the RFID swipe proves the operator was present for the seatbelt locking and the computer records it. These examples both make absolute sense from a liability standpoint. Keeping the RRRC op at the panel until the other train parks is absolutely pointless.
  9. Yep, when it was 2 trains with the old ones the supervisor had to stay behind the panel while the train was on the lift (to stop it if needed) but the second the train left the lift, they would leave the panel to allow people to get behind the gates while the operator would check the single lap bar harness. It worked very well TBH. To run it really efficiently with 2 trains now you'd basically need 2 loaders and the supervisor but that won't ever happen.
  10. They would be pretty much the same, except maybe some under the hood things for the LSM launch instead of the chain lift. Maybe a few *minor* tweaks as there's a few years between them but nothing major at all.
  11. Yesterday
  12. Other than the RFID scanner on Taipan, I thought they were essentially the same?
  13. Sounds like efficiency has gone down if the supervisor performs harness checks but can't leave the panel until the train reaches the brake run. You might as well just run one train. So yes, the dual harnesses would reduce throughput as the supervisor needs to check their side.
  14. I'm sure there will be some productive and insightful discussion on Facebook over this
  15. 100% it would have caused some changes, however to what extent I wouldn't be sure. I'd say right after the incident things would have been very strict for a while before loosening off a little bit. However I feel that the parks are still being a bit over the top, how much of that comes down to corporate (and staff just not caring) or procedures enforced by over-cautious insurance is hard to say. I'd say it's a combination of both, but also possibly due to workplace culture. When you have management that actually cares it shows, because staff want to actually be there if they are being treated well and respected. Something that the Dreamworld management seem to be very good at (And having worked at MW during the time that they were running things, they actually really do care about their staff)
  16. It wouldn’t surprise me if it’s a trial/they consider implementing it at their other parks too. I’ve noticed more “eftpos only” at Movie World than there was previously especially in Mobiles.
  17. If card is the only option they cant add a surcharge
  18. They mean 'We don't need to maintain floats, pay staff to manage cash/reconcile registers at the end of the day, or pay bank fees for cash processing - and we get to add a card surcharge if we want so it costs us nothing'.
  19. Last week
  20. "Faster, safer and more convenient". Okay then.
  21. I don't believe this is possible. I think it might be due to the rockwork tunnel between the overbank hill and the loop and the rockwork between the midcourse and the twisted horseshoe roll clearance envelope. Taking a quick look at other blue fire clones none of them seem to have a max height.
  22. @Spotty i'm curious, how much do you think these changes to load times are because of management vs post 2016 safety laws? And to add to it enthusiasm working with friends (like your story above) vs i guess the i don't want to be here days everyone has.
  1. Load more activity
×
×
  • Create New...

Important Information

By using this site, you agree to our Terms of Use. We have placed cookies on your device to help make this website better. You can adjust your cookie settings, otherwise we'll assume you're okay to continue.