19 hours ago, HarryHeHe8 said:

It’s coming along so fast too.

Claw came together similarly fast. When you think about it - it's four supports, the motor assembly and the swing arm\gondola. It kinda has to go up quick because each side of the supports relies on the other side to hold each other (which is why there are so many cranes holding everything as it goes up)

Once it's up though you can expect to see visible progress slow a bit as the finer details are taken care of.

 

Honestly though - if we keep getting good weather, we could see testing by September... fingers crossed for an earlier than boxing day open!

  • Like 1
Link to comment
Share on other sites

19 minutes ago, DaptoFunlandGuy said:

Honestly though - if we keep getting good weather, we could see testing by September

Considering The Claw started construction at the start of the year and was open in September, I’m honestly expecting a similar timeframe (if there aren’t any weather delays).

Link to comment
Share on other sites

On 19/07/2004 at 3:44 PM, kennykoala said:

I was at dreamworld on sunday(no news to give u!) I was at dreamworld today(monday) the supports were all inside the constrution zone...I was there at 10-30 today and they have already placed together two of the 4 supports, and the other two were getting ready to be joined. They are joined together waith a triangle piece, and inside the triangle is a circle, this is were im guessing will be were the rides boom attatches to the swinging pole. the area were the ride is has been fenced off wider now. the pieces are joined together put r still laying on the ground,,(i left the park so anything could have happend since then) so when u look into the area the pieces look like two big V' s joined...i didnt have my cam(i got a new digital cam so ill be able to take photos now for u. they have also welded on a maintanance ladder the entire length of one of the supports. (lots of workers there and big men in suits) (the triangle pieces must of arrived today because i havent seen them in the car park.)

This post from July 19, 2004, shows that supports were only being installed on The Claw in mid-July.

The ride opened September 18, 2004.

Dreamworld is definitely aiming for a September holiday opening.

  • Like 2
Link to comment
Share on other sites

2 hours ago, wikiverse said:

This post from July 19, 2004, shows that supports were only being installed on The Claw in mid-July.

The ride opened September 18, 2004.

Dreamworld is definitely aiming for a September holiday opening.

I want to congratulate you for trawling back that far to find that. That's really impressive. 

 

While King Claw might have 'more theming' than Claw did - the construction comparisons we've seen posted here recently also show that when Claw went up, the site was greenfields, so they built all the structures after the ride was up - whereas we can already see the majority of the queue structure is already up and ready - so they've got a head start on the theming and while there is still more to do - September is definitely possible.

 

1 hour ago, themagician said:

Another great pic from @Theme Park Girl

IMG_1209.thumb.jpeg.fa3ad5aed75ce924384ad4b87f027280.jpeg

And for reference, here is a photo of The Claw from many years ago.

IMG_1210.thumb.jpeg.99634c907a928dddf3b3d57c0c110d0b.jpeg

You can see that the roof at the front right is still the same as gives an indication of how insanely big King Claw actually is!

That's a great comparison shot there, although the depth is a bit different, it's definitely bigger.

It's an absolutely bollocks perspective, but the pines in ocean parade have grown too. Not sure the year on Magician's Claw pic above, but the pines on the extreme right were the height of Claw, and now are the height of king claw!

Link to comment
Share on other sites

15 hours ago, New display name said:

JR second waterfall still not working.

MM wheelchair accessible cars still to come.

Train can't do loop de loops.

But also remember down the road we’re stilling waiting on Superman Escape to have its queue/locker upgrades, an all new dining experience to open, Doomsday to be replaced, Scooby to open, for WoO to become world class and for them to sort out their electrical system so they don’t have wiring hanging above guest areas.

(The last couple I added for dramatic effect, but you get my point).

Link to comment
Share on other sites

I think it's safe to put to bed that this fencing was likely intended to be the envelope fencing, and they had to change to the black fencing for compliance reasons. There's nowhere left in rivertown where all this fencing would be practical, so probably safe to say this is excess (though hopefully in the future they can use it elsewhere)

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

Loading...

×
×
  • Create New...

Important Information

By using this site, you agree to our Terms of Use. We have placed cookies on your device to help make this website better. You can adjust your cookie settings, otherwise we'll assume you're okay to continue.